Want the latest from us in your inbox? Sign up for updates here.

Main navigation

Enerkem Alberta Biofuels Project – Phase 2

Economic Sector
Waste Management
Environmental Benefits
Climate change
Status
Active
Consortium members
Enerkem Alberta Biofueld LPEnerkem Inc.
Year Approved
2014
Year Announced
2014
SDTC Funding
$53,250,000
Leveraged Funding
$108,793,554
Total Project Value
$162,043,554

Lead organization:

Enerkem Alberta Biofuels LP

Description:

Enerkem Inc. intends to build, own, and operate a commercial next generation cellulosic ethanol plant capable of converting 100,000 Bone Dry Metric Tons (BDMT) of sorted Municipal Solid Waste (MSW) into 38 million litres of cellulosic ethanol. The Project will utilize thermochemical gasification process technology developed by Enerkem and is sited adjacent to the City of Edmonton Integrated Waste Management Centre (EWMC). In addition to producing ethanol the facility will have the capability to provide bio-methanol as a co-product.

Location:

Alberta
SDTC Annual Statistics 2016-2017 Image